服务热线电话
400-840-8766
一个水上乐园的建造需要详细的设计流程
来源:https://www.hcseaworld.com/ 日期:2022-07-02 发布人:admin 浏览量:次
水上乐园是近年来比较流行、容易吸金的主题旅游产品之一。 如果水上乐园一直处于不归状态,直接关系到它的项目规划和规划。 如何更好更快地推进项目建设,实现落地运营? 水上乐园的建设需要一个详细的设计过程。
Water park is one of the popular theme tourism products that are easy to attract gold in recent years. If the water park has been in a state of non return, it is directly related to its project planning and planning. How to better and faster promote the project construction and realize the landing operation? The construction of water park needs a detailed design process.
1、投资规划:考察项目的市场、经济和同行竞争情况,确定项目的市场定位,确定项目的合理投资金额和各功能模块的投资比例。
1. Investment planning: investigate the market, economy and peer competition of the project, determine the market positioning of the project, determine the reasonable investment amount of the project and the investment proportion of each functional module.
2、品牌策划:根据投资策划思路,根据市场 定位和吸引力,确定项目品牌战略和竞争战略。 从目标消费群体和项目未来营销的角度,进行娱乐创意,规划项目的亮点和卖点,打造差异化。
2. Brand planning: determine the brand strategy and competitive strategy of the project according to the investment planning ideas and market positioning and attraction. From the perspective of target consumer groups and future marketing of the project, carry out entertainment creativity, plan the highlights and selling points of the project, and create differentiation.
3、设计策划:按照投资策划和品牌策划的思路,过渡到设计实施,围绕项目的特点和差异化,对设计内容进行全面的组织和深化。 确定建设内容和功能划分,选择建筑风格、文化主题、水上乐园设备并分析可行性,为后续设计提供控制技术指标的要求或指导。
3. Design planning: according to the ideas of investment planning and brand planning, transition to design implementation, and comprehensively organize and deepen the design content around the characteristics and differentiation of the project. Determine the construction content and function division, select architectural style, cultural theme, water park equipment and analyze the feasibility, so as to provide requirements or guidance for subsequent design to control technical indicators.
4、总体规划设计:通过总体规划设计图表达项目的建设内容和布局,确定项目各功能区的空间位置关系及其与外界的联系,提出主要标志性建筑 造型方案和重要节点景观方案,指出设计要点,合理布置水上乐园设备。
4. Overall planning and Design: express the construction content and layout of the project through the overall planning and design drawings, determine the spatial location relationship of each functional area of the project and its connection with the outside world, put forward the main landmark building modeling scheme and important node landscape scheme, point out the design points, and reasonably arrange the water park equipment.
5、初步设计:根据总体设计图深化分区的具体设计,提炼娱乐创意和核心项目的重点内容,确定技术方案和主要参数。
5. Preliminary design: deepen the specific design of the partition according to the overall design drawing, refine the entertainment creativity and the key contents of the core project, and determine the technical scheme and main parameters.
6、施工图设计:室内水上乐园设备厂商认为应该编制详细的总图、分专业的详细图、施工概算,并表达每个细节的具体尺寸、材料、做法等技术要求。
6. Construction drawing design: the equipment manufacturer of the indoor water park believes that it is necessary to prepare detailed general drawings, detailed drawings by discipline, and construction estimates, and express the specific size, materials, practices and other technical requirements of each detail.
因此,水上乐园的筹建,并不是简单地从字面上理解项目的筹建和建设,而是将项目作为一个整体进行协调、运营和管理的过程。后续大家想了解更多相关知识内容,可以持续关注我们的官网https://www.hcseaworld.com,有什么需要大家随时联系我们。
Therefore, the preparation of the water park is not simply to understand the preparation and construction of the project literally, but to coordinate, operate and manage the project as a whole. In the future, if you want to know more about relevant knowledge, you can continue to pay attention to our official website https://www.hcseaworld.com , please feel free to contact us if you need anything.
相关新闻
- 室内儿童水上乐园设备应该要满足什么需求?2023-03-18
- 水上滑梯设备在制作设计过程中的事项2023-03-17
- 水上乐园设备设计的要点有哪些?2023-03-16
- 水上乐园的卫生工作又该如何开展2023-03-15
- 解析购置水上新型游乐设备的好处2023-03-14
- 使用儿童戏水设施前一定要先检查设备情况!2023-03-13
- 水上滑梯设备的安全下滑方式2023-03-11
- 怎样的游乐设备适合作为景点配套设施2023-03-10